Monday, September 30, 2019

One Monthly Goal Done...

...done, just under the wire. The top of the Heat Wave quilt is done! It turned out that it wasn't that refreshing of a change, lol. This was one of the more challenging projects I've done because of all the points. There was a lot of sewing, ripping and re-sewing to get points where I wanted them, and it is still far from perfect. But it won't get better, so it was time to stop fiddling with it and get done.

No idea how or when it will get quilted; but after 25 years, it's a good feeling to have the top done.

Ready or not, fall has arrived in Maine, a bit early this year it seems. The temperatures are already dipping, and the leaves are changing color and falling. Even this tiny tree, barely an inch and a half tall, is starting to turn red. Summer is my least favorite season, but we had such a beautiful summer this year that I hate to see it come to an end.

5 comments:

Patty said...

That looks awesome! Thanks for linking up with Elm Street Quilts One Monthly Goal and congrats on your finish.

Judy S. said...

That's quite amazing! Have you done any knitting lately, too?

Chantal said...

Stunning! Wow! it might not be perfect in your eyes but it's fabulous in mine. ;^)

Julie Fukuda said...

That is stunning but it looks like a real challenge with all those points. Congratulations on getting it done.

cityquilter grace said...

wow...that is beautiful indeed....believe it or not we are in the 50s today, 40s last night...big change from 98 on wednesday....so glad those 90s are gone....love your header photo...