Sunday, January 11, 2009

Sunday Stash Report

I got alot more done this week than I expected to, but I didn't get this little strippy loaded as I'd planned. The yardage was already counted in last year's totals, so nothing gained there. Along with finishing this top, my little crosstitch ornament, and the pillowcases, I also finished 12 of the 13 Star Block of the Month blocks. The last block has been cut out, so I've now used a total of 4-3/8 yards in these blocks. I also received a Keepsake medley in my mail this week, which added a yard and a half.

Here is the Stash Manager's Report:

Fabric used this week: 4-3/8 yards
Fabric used year to date: 6-5/8
Fabric added this week: 1-/2 yards
Fabric added year to date: 1-1/2 yards
Net year to date: 5-1/8 yards

This week I'd like to quilt my strippy and bind it, finish the last Star block, and start piecing one of these hexagon blocks. You may have noticed a new logo in my side bar for the Great Hexagon Quilt Along. This is a new blog started by a couple of quilters who were interested in making this hexagon quilt. Other quilters were invited to participate in recreating this quilt or working on a hexagon project of their choosing. I've been interested in working on some kind of handpieced quilt like this for quite a while, so I decided to give it a whirl. Thanks to Robyn at DaisyQuilts for doing this.

Wednesday, January 7, 2009

January WISP

WISP--that would be Works in Slow Progress (otherwise known as UFOs), which is the name Kris is using for her One Project a Month Challenge; and this quilt will be my project for January.

Does anyone make watercolor quilts anymore? Watercolor Bars is one of two watercolor quilts I made back when I was living overseas, so it's probably 9 years old. This one was made square by square, as opposed to the second one which was made with strips which were then cut apart to make four identical blocks. I really enjoyed making this one, but was it ever time-consuming to choose each and every square. I'd really like to make another one.

It started out life as a round robin. At the time, I couldn't fathom how a watercolor round robin would work.... and apparently neither could any of my four swap mates, because what I got back was a mish mash of squares with no discernible pattern whatsoever. I'm pretty sure theirs were no better. I took all the squares apart and reassembled them into this bar pattern, the goal being to reuse every single square that had been part of the original project. I remember now I only had a very few squares left over that I simply couldn't find a place for.

Probably the main obstacle to completing the quilt back then was indecision about how to quilt it. This morning I made the monumentous decision to simply quilt diagonal lines through each square. The second obstacle was deciding to use either invisible nylon or regular thread. I'm really not crazy about invisible nylon because of the shine, but in a quilt with so many colors like this one, it would probably work very well.

In any case, I have the entire month of January to finish it and fulfill my challenge obligation, so I'll spend the rest of this week choosing backing, creating the quilt sandwich, and choosing some thread. No need to rush into it, is there?

My pillowcases to go with the Tug of War quilt are finished, and I put together the little chickadee ornament last night. The glue is dry, and it's finished! The back of it looks just like the one on the right, which is a little nutcracker I made long time ago. I want to work on some other ornaments this year, mostly but not all crosstitch--the list of things to do in '09 is growing! I also finished sewing another strippy top but haven't loaded it for quilting yet. I'm going to do that probably this evening.

It's snowing in Maine today, and the weatherman has predicted 4-8 inches. The weathermen are rarely correct up here, and I'll be surprised if we get four inches, especially since right now it's sleeting. Soup is perfect for supper tonight!

Sunday, January 4, 2009

Sunday Stash Report

Today was a sunny, windy and very cold day. I think I am finally on the back side of the vertigo, thank heavens! Today is the best I've felt since New Year's Eve, and I took only a single dramamine tablet early this afternoon. I was even able to look down without my head spinning, so I cut and sewed a couple of pillowcases this evening to go with the Tug of War quilt I just finished.

What you can't see in the photo is a small balsam tree that was sitting on the corner of my table. I watered the tree earlier (do you know what's coming?); and yes, unbeknownst to me the water spilled over the pot onto the table and onto the piece of paper that now looks like watercolors in the upper left corner of the photograph. My new pillowcase that I just finished soaked up some of that color from the page. Horrors!

I immediately rushed it into the laundry room, sprayed it with a little prewash, and threw it in the wash. Most all the stain came out, and what's left I don't think will be noticeable. Whew!

Here's the Stash Manager's Report:

Fabric used this week: 2-1/4 yards
Fabric used year to date: 2-1/4 yards
Fabric added this week: 0 yards
Fabric added year to date: 0 yards
Net year to date: 2-1/4 yards

Gee, it's nice to be on the positive side again!

We took down the Christmas tree and all the trimmings today. We usually take it down New Year's Day, but we decided to wait til the weekend and enjoy it a little longer. I love the smell of fresh greenery in the house, looking at all the little handmade ornaments, and remembering Christmases past, so I don't look forward to taking it all down. Once it's down though, I'm happy to reclaim the space in the living room and have things back to normal.

This week my goals are to finish the second pillowcase, assemble the little chickadee crosstitch into an ornament, finish piecing and load another strippy on the longarm for practice, and make some headway with the Star Block of the Month blocks. I haven't looked at it for quite a while, and I think I'm six blocks behind. I intend to finish all of the blocks by the end of the month!

Saturday, January 3, 2009

Last Finish for 2008

I woke up the morning of New Year's Eve with terrible, incapacitating vertigo, which I've never had before. Has anyone else ever experienced this? I couldn't move my head more than a couple of inches without the room spinning and getting sick to my stomach, and I spent the entire day and evening in bed. Since New Year's Eve, dramamine (for motion sickness) has helped immeasurably and enabled me to be both ambulatory and somewhat functional, but it's a treatment for the symptom, not the problem.

On Friday, the doctor said many times a cause for vertigo is not known, but usually it goes away on its own. It may also recur at any time or not for 10 years or never. Hardly what I wanted to hear, and I'll be very happy if it will just go away now. The doctor has scheduled a cat scan to rule out other possibilities.

I am supposed to return to work on Monday morning; and even though the doctor has said I can drive while taking dramamine, it's not a prospect I'm really looking forward to.

It's hard to keep a dedicated quilter down though, so in spite of the vertigo, I did manage to finish up the last little bit of binding on the Tug of War quilt. Technically speaking I finished this quilt on New Year's Day; but out of 410 inches of binding, I only had about 18 inches left to hand sew, and I would have finished it on New Year's Eve had I not been flat on my back in bed. So I'm counting it as a finish for 2008.

Hope everyone else rang in the New Year in style. I've been catching up on blog reading today, and lots of bloggers seem to be very focused on either cleaning and reorganizing or contemplating goals for the new year. Either way, everyone seems to be looking forward to a fresh start, and that includes me too.

Along those lines, Amanda has already signed up for two challenges, one for Pay it Forward and the other for One Project a Month. The latter has more appeal for me, and the idea is to finish at least one project a month, whether it's a UFO (the original idea) or something new. I have a thousand and one UFOs, so that will be one of my goals this year.

Sunday, December 28, 2008

Sunday Stash Report

I hope everyone had a nice Christmas with family and friends. Both my sons were here for the holiday, and Rob's girlfriend Mary joined us for Christmas dinner, and we had a good time.

We got 17 inches of snow in my town during the blizzard last week. Portland had a record snowfall of 14 inches, the most ever during a single storm. Eustis, Maine got 41 inches of snow. Do you suppose AlG has been pulling our legs with this global warming thing?

Nothing in and nothing out from the stash this week. Even though I finished the year in the hole by 158 yards, I found the process of tracking the stash very entertaining, and I can truthfully say that I shopped with purpose when I did go shopping for fabric. Much of the fabric I bought this year was used for the patterns I tested for Koleen. She is taking a year off from designing, so I expect (hope) to be working more from my stash this coming year and shopping less.

I found it equally entertaining reading about everyone else's stashbusting efforts. In that regard, Vicky's stash reports were my favorite because of the wild swings in her numbers and the humor with which she treated it. Pat and Lori also had impressive stash reports for the year. Pat succeeded in using nearly all of what she bought, and she amazed me with her productivity. Lori actually used 128 more yards than she purchased, so she was a stashbuster extraordinaire.

I finished this little strippy today, which will be donated. I quilted it with the Effervescence pantograph from Willow Leaf. This is the design I plan to quilt on my Orange Crush, but I want more practice with it first, so I'll make another strippy for that. I had trouble with tension and loops on the back of this quilt. The loops disappeared after the first couple rows, and I never did figure out the cause of it, but I was messing around with the bobbin tension throughout the quilting process. I finally managed to get the tension adjusted correctly on the very last row of stitching. Tension is the one thing that still gives me fits.

I've finished binding three sides of the Tug of War quilt; and even though I am working the last three days of the year, I'll get it finished before New Year's.

Sunday, December 21, 2008

Blizzard!

Doesn't look like it's snowing, does it? But anyone who pays much attention to the weather knows that in the Northeast we are getting hit with a huge snowstorm. A blizzard warning has been issued for some counties in the state, and in central Maine we are expecting 8-20 inches. (That's pretty broad, isn't it?)

We had a storm earlier this week on Wednesday. It was only a couple of inches, but it was enough to make for terrible driving conditions. When I went to work that morning, the interstate hadn't been plowed completely, so only one lane was mostly clear. Right before I got to Augusta, I was concentrating so hard on staying in my lane that I missed the fact that traffic had come to a complete stop on the interstate, probably from an accident up ahead. By the time I realized it, it was too late. I slammed on the brakes, but I wasn't aware that the car even slowed down. I knew if I crashed into the cars a lot of people would be hurt, so I steered the car off the road into a ditch. When I left the highway I was driving close to 50 mph.

It was a wild ride as I drove down the embankment, into a ditch filled with muddy water and cattails, out the other side of the ditch into a field, and then back into the ditch, where I came to rest. Other than scaring myself half to death, I was absolutely fine, and my car was fine too. Two other cars behind me also went off the road into the ditch, and two or three cars behind us crashed into each other on the interstate. It was a mess! I discovered there was a tow truck coming right up the shoulder--I'm guessing he must have been pulling people out all morning--and he hauled all three of us out of the ditch too. By the time I got back on the road again, I was shaking so hard I could hardly drive. I was foolish to drive that fast, given the road conditions, but it is a lesson I only need to learn once.

Needless to say, when I came home from work this afternoon in the middle of the snowstorm, I drove at a comfortable 35 mph, which was well below the posted speed. A long train of cars formed behind me, and most were content to follow the leader. At one point a tractor trailor zoomed by me at about 65 mph, and less than two miles down the highway the driver went off the road into the trees. I hope he was alright. My son, who was also working today and drove home from Lewiston in near blizzard conditions, also got home okay. We're in for the night!

Sunday Stash Report

I am exhausted from working so many hours this month; and as the month wears on I find I have less and less energy to do anything including sewing. Beginning the week after Christmas though, my schedule will get back to normal. I have lots of things to get caught up with.

In the meantime, I've been chipping away at a few little odds and ends in the sewing room and finally got the binding done on this quilt, which you've seen before here. This is my fourteenth finish for the year.

Next up is the binding for the Tug O' War quilt, which I've already started on. This is the biggest quilt I've ever made, about 95" x 110", so it'll take some time. I almost have the second side finished.

I also took the time to throw a little pink and blue strippy on the longarm to practice the bubbles pantograph I want to use on the Orange Crush quilt. I'm still hoping to get these two quilts finished before year's end, but I'm rapidly running out of time. If I could just get a day off somewhere, I could do it!

In the last couple of weeks, I've added a grand total of 3 yards to the stash. Not bad, eh? Haven't used anything though. The backing for the pink and blue strippy was a flannel sheet from the thrift shop that looked pretty new, and I never counted it into the stash.

Here's the Stash Manager's report:

Fabric used this week: 0 yards
Fabric used year to date: 196-7/8 yards
Fabric added this week: 3 yards
Fabric added year to date: 354-7/8 yards
Net year to date: - 158 yards

Years ago before I began quilting I was passionate about crosstitch, but I haven't done it for a long time. I started this small piece a couple of years ago as a Christmas ornament. All I had left to do was add a few musical notes, but I put it away and never finished it. I dug it out a few days ago, as it's a perfect thing to work on when I'm too tired for anything else.

I've also given some more thought to what I want to do in the sewing room next year. I never make New Year's resolutions because I never keep them, but the New Year still represents a new beginning and new opportunities. Besides focusing on scrap quilts, I'd like to spend more time learning my Electric Quilt program and learning machine embroidery. I recently found a new blogger who does some machine embroidery and enjoyed browsing her site. She made a free standing lace ornament of an ice skate that I really liked. My good friend Barb made some lace segments which she then draped over a glass Christmas bulb, and it was lovely. Inspiration abounds!